Cases

当前位置:首页 >> Cases >> Bridge Construction

18 pieces of prestressed concrete box girders for Hongkong’s Tseung Kwan O Cross Sea Bridge are roll on/roll off loaded onto the ship

更新时间:2025-10-23点击次数:3


1760172798603428.png

11 PPU+128 axle lines SPMT are used for roll on/roll off loading onto the ship. Solved the problem of compressive failure (cracking) of the bottom concrete of prestressed concrete box beams and tensile cracking (cracking) of the top concrete of box beams during the entire force conversion process of handling and loading.

Copyright © Wuhan Iwheel Logistics Equipment Technology

XML

网站二维码
关注

联系

13971331119

联系
顶部