One PPU and 24-axis module vehicle will be used for transportation, which needs to be transported from the unloading dock to the petrochemical plant for storage. The transportation distance is long, requiring the use of main roads. The single transportation time is relatively long, with a construction period of 7 months (approximately 10 items per month).