Cases
更新时间:2025-10-23
点击次数:13 

The offshore wind turbine monopile of Yangjiang Third Harbor Engineering Co., Ltd. is 9/7.5m×94m, weighing approximately 1,607 tons. It is transported on-site using (2PPU+60-axis module vehicle) and rolled onto the ship.
公司邮箱: fx@iwheeltech.com
服务热线: 13971331119
公司地址: 1303, 13th Floor, Longyue Building, No. 42, Guanggu First Road, East Lake High-tech Development Zone, Wuhan