Cases
更新时间:2025-12-03
点击次数:13 



Zhaoqing Shipyard Ship Transport Alignment,30.8m × 20m × 5.2m, weighing 500 tons, totaling 3 pieces,2 PPU+24 axle lines SPMT are used for on-site transportation and alignment; Using SPMT for precise positioning with an accuracy of approximately 10mm; Ship sections can be manufactured in batches and at different locations to improve construction efficiency
公司邮箱: fx@iwheeltech.com
服务热线: 13971331119
公司地址: 1303, 13th Floor, Longyue Building, No. 42, Guanggu First Road, East Lake High-tech Development Zone, Wuhan