Two main transformers from Leizhou Power Plant are unloaded and transported to their designated locations by ship,11.9m × 3.7m × 5.4m, weight 480 tons,Use 2PPU+20 axle lines modular trailer to transport the transformer to the foundation site, and move the hydraulic cylinder in place.